Tariff Monitor
Tariffs on Imports From Bosnia and Herzegovina
In 2025, U.S. importers brought in $48.0M of goods from Bosnia and Herzegovina across 46 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 13.39%, up from 1.54% the year before. Bosnia and Herzegovina's largest tracked categories: steel bar, rod, and wire, fabricated structural steel, electric motors and generators. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Bosnia and Herzegovina: $48.0M in 2025 across 46 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 13.39% (1.54% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Bosnia and Herzegovina
- Steel bar, rod, and wire
- Fabricated structural steel
- Electric motors and generators
- Filtering and separation equipment
- Foundry and rolling equipment
Frequently asked questions
- How much does the U.S. import from Bosnia and Herzegovina? U.S. imports from Bosnia and Herzegovina totaled $48.0M in customs value in 2025, across the 46 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Bosnia and Herzegovina? In 2025, imports from Bosnia and Herzegovina had an effective calculated-duty rate of 13.39% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 1.54%.
- What does the U.S. import most from Bosnia and Herzegovina? Among tracked manufacturing families, Bosnia and Herzegovina's largest recent categories are steel bar, rod, and wire, fabricated structural steel, electric motors and generators, filtering and separation equipment. Each has its own live rate page linked below.
- Is the tariff burden on Bosnia and Herzegovina rising or falling? Rising: the effective rate on tracked imports from Bosnia and Herzegovina moved +11.9 points year over year to 13.39% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.