Tariff Monitor
Tariffs on Imports From Nigeria
In 2025, U.S. importers brought in $28.4M of goods from Nigeria across 21 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 6.57%, up from 2.79% the year before. Nigeria's largest tracked categories: plastic semi-finished products, plastics in primary forms, rubber materials and products. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Nigeria: $28.4M in 2025 across 21 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 6.57% (2.79% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Nigeria
- Plastic semi-finished products
- Plastics in primary forms
- Rubber materials and products
- Internal combustion engines
- Compressors and fans
Frequently asked questions
- How much does the U.S. import from Nigeria? U.S. imports from Nigeria totaled $28.4M in customs value in 2025, across the 21 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Nigeria? In 2025, imports from Nigeria had an effective calculated-duty rate of 6.57% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 2.79%.
- What does the U.S. import most from Nigeria? Among tracked manufacturing families, Nigeria's largest recent categories are plastic semi-finished products, plastics in primary forms, rubber materials and products, internal combustion engines. Each has its own live rate page linked below.
- Is the tariff burden on Nigeria rising or falling? Rising: the effective rate on tracked imports from Nigeria moved +3.8 points year over year to 6.57% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.