Tariff Monitor

U.S. Imports of Nickel and nickel alloys From Brazil

In 2025, U.S. importers brought in $10.6M of nickel and nickel alloys from Brazil; the reported effective calculated-duty rate was 5.12% for that flow. That makes Brazil the 19th-largest named source of this family, at 0.5% of tracked nickel and nickel alloys imports. The family-wide effective calculated-duty rate is 4.38%, so Brazil's observed rate is 0.7 points more than average. Freight and insurance add 0.42% on top of customs value. Tracked-family figures are a floor on total bilateral trade.

The current reading

  • Import value: $10.6M of nickel and nickel alloys from Brazil in 2025, customs value.
  • Observed effective calculated-duty rate: 5.12%, reported Calculated Duties ÷ covered customs value, 0.7 points above the 4.38% family average.
  • Share of the family: 0.5%, #19 named source of nickel and nickel alloys.
  • Reported freight and insurance: 0.42% of customs value, shown alongside the effective calculated-duty rate.
  • History depth: 4 years of annual named-source boards.

Frequently asked questions

  • What tariff does the U.S. charge on nickel and nickel alloys from Brazil? In 2025, the reported effective calculated-duty rate was 5.12% for nickel and nickel alloys imported from Brazil, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
  • How much nickel and nickel alloys does the U.S. import from Brazil? The U.S. imported $10.6M of nickel and nickel alloys from Brazil in 2025, 0.5% of the tracked nickel and nickel alloys it imports, ranking Brazil the 19th-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
  • What does freight add on nickel and nickel alloys from Brazil? Cost, insurance, and freight ran 0.42% of customs value on nickel and nickel alloys from Brazil in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.