Tariff Monitor
Tariffs on Imports From British Virgin Islands
In 2025, U.S. importers brought in $7K of goods from British Virgin Islands across 3 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 1.01%, up from 0.04% the year before. British Virgin Islands's largest tracked categories: capacitors, resistors, and circuit boards, transformers and power supplies, robots and automated machinery. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from British Virgin Islands: $7K in 2025 across 3 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 1.01% (0.04% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from British Virgin Islands
- Capacitors, resistors, and circuit boards
- Transformers and power supplies
- Robots and automated machinery
- Measuring and inspection instruments
- Batteries and storage cells
Frequently asked questions
- How much does the U.S. import from British Virgin Islands? U.S. imports from British Virgin Islands totaled $7K in customs value in 2025, across the 3 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from British Virgin Islands? In 2025, imports from British Virgin Islands had an effective calculated-duty rate of 1.01% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.04%.
- What does the U.S. import most from British Virgin Islands? Among tracked manufacturing families, British Virgin Islands's largest recent categories are capacitors, resistors, and circuit boards, transformers and power supplies, robots and automated machinery, measuring and inspection instruments. Each has its own live rate page linked below.
- Is the tariff burden on British Virgin Islands rising or falling? Rising: the effective rate on tracked imports from British Virgin Islands moved +1 points year over year to 1.01% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.