Tariff Monitor

Tariffs on Imports From West Bank

In 2025, U.S. importers brought in $5K of goods from West Bank across 1 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 10.01%, up from 0% the year before. West Bank's largest tracked categories: internal combustion engines. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from West Bank: $5K in 2025 across 1 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 10.01% (0% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from West Bank

  • Internal combustion engines

Frequently asked questions

  • How much does the U.S. import from West Bank? U.S. imports from West Bank totaled $5K in customs value in 2025, across the 1 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from West Bank? In 2025, imports from West Bank had an effective calculated-duty rate of 10.01% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0%.
  • Is the tariff burden on West Bank rising or falling? Rising: the effective rate on tracked imports from West Bank moved +10 points year over year to 10.01% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.