Tariff Monitor

U.S. Imports of Industrial furnaces and ovens From China

In 2025, U.S. importers brought in $171.1M of industrial furnaces and ovens from China; the reported effective calculated-duty rate was 29.54% for that flow. That makes China the 2nd-largest named source of this family, at 12.8% of tracked industrial furnaces and ovens imports. The family-wide effective calculated-duty rate is 9.65%, so China's observed rate is 19.9 points more than average. Freight and insurance add 4.03% on top of customs value. Tracked-family figures are a floor on total bilateral trade.

The current reading

  • Import value: $171.1M of industrial furnaces and ovens from China in 2025, customs value.
  • Observed effective calculated-duty rate: 29.54%, reported Calculated Duties ÷ covered customs value, 19.9 points above the 9.65% family average.
  • Share of the family: 12.8%, #2 named source of industrial furnaces and ovens.
  • Reported freight and insurance: 4.03% of customs value, shown alongside the effective calculated-duty rate.
  • History depth: 3 years of annual named-source boards.

Frequently asked questions

  • What tariff does the U.S. charge on industrial furnaces and ovens from China? In 2025, the reported effective calculated-duty rate was 29.54% for industrial furnaces and ovens imported from China, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
  • How much industrial furnaces and ovens does the U.S. import from China? The U.S. imported $171.1M of industrial furnaces and ovens from China in 2025, 12.8% of the tracked industrial furnaces and ovens it imports, ranking China the 2nd-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
  • What does freight add on industrial furnaces and ovens from China? Cost, insurance, and freight ran 4.03% of customs value on industrial furnaces and ovens from China in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.