Tariff Monitor
Tariffs on Imports From Equatorial Guinea
In 2025, U.S. importers brought in $238K of goods from Equatorial Guinea across 2 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 11.49%, up from 0% the year before. Equatorial Guinea's largest tracked categories: turbines and fluid-power drives, measuring and inspection instruments. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Equatorial Guinea: $238K in 2025 across 2 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 11.49% (0% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Equatorial Guinea
- Turbines and fluid-power drives
- Measuring and inspection instruments
Frequently asked questions
- How much does the U.S. import from Equatorial Guinea? U.S. imports from Equatorial Guinea totaled $238K in customs value in 2025, across the 2 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Equatorial Guinea? In 2025, imports from Equatorial Guinea had an effective calculated-duty rate of 11.49% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0%.
- What does the U.S. import most from Equatorial Guinea? Among tracked manufacturing families, Equatorial Guinea's largest recent categories are turbines and fluid-power drives, measuring and inspection instruments. Each has its own live rate page linked below.
- Is the tariff burden on Equatorial Guinea rising or falling? Rising: the effective rate on tracked imports from Equatorial Guinea moved +11.5 points year over year to 11.49% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.