Tariff Monitor
Tariffs on Imports From Faroe Islands
In 2025, U.S. importers brought in $482K of goods from Faroe Islands across 10 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 11.7%, up from 2.12% the year before. Faroe Islands's largest tracked categories: plastic semi-finished products, measuring and inspection instruments, internal combustion engines. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Faroe Islands: $482K in 2025 across 10 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 11.7% (2.12% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Faroe Islands
- Plastic semi-finished products
- Measuring and inspection instruments
- Internal combustion engines
- Steel fasteners
- Rubber materials and products
Frequently asked questions
- How much does the U.S. import from Faroe Islands? U.S. imports from Faroe Islands totaled $482K in customs value in 2025, across the 10 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Faroe Islands? In 2025, imports from Faroe Islands had an effective calculated-duty rate of 11.7% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 2.12%.
- What does the U.S. import most from Faroe Islands? Among tracked manufacturing families, Faroe Islands's largest recent categories are plastic semi-finished products, measuring and inspection instruments, internal combustion engines, steel fasteners. Each has its own live rate page linked below.
- Is the tariff burden on Faroe Islands rising or falling? Rising: the effective rate on tracked imports from Faroe Islands moved +9.6 points year over year to 11.7% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.