Tariff Monitor

Tariffs on Imports From Zambia

In 2025, U.S. importers brought in $472K of goods from Zambia across 5 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 14.23%, up from 2.09% the year before. Zambia's largest tracked categories: gears and power transmission, electric motors and generators, internal combustion engines. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Zambia: $472K in 2025 across 5 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 14.23% (2.09% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from Zambia

  • Gears and power transmission
  • Electric motors and generators
  • Internal combustion engines
  • Switchgear, connectors, and controls
  • Paints, coatings, and finishes

Frequently asked questions

  • How much does the U.S. import from Zambia? U.S. imports from Zambia totaled $472K in customs value in 2025, across the 5 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Zambia? In 2025, imports from Zambia had an effective calculated-duty rate of 14.23% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 2.09%.
  • What does the U.S. import most from Zambia? Among tracked manufacturing families, Zambia's largest recent categories are gears and power transmission, electric motors and generators, internal combustion engines, switchgear, connectors, and controls. Each has its own live rate page linked below.
  • Is the tariff burden on Zambia rising or falling? Rising: the effective rate on tracked imports from Zambia moved +12.1 points year over year to 14.23% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.