Tariff Monitor
Tariffs on Imports From Hong Kong
In 2025, U.S. importers brought in $81.8M of goods from Hong Kong across 52 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 23.58%, up from 2.44% the year before. Hong Kong's largest tracked categories: insulated wire and cable, transformers and power supplies, batteries and storage cells. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Hong Kong: $81.8M in 2025 across 52 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 23.58% (2.44% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Hong Kong
- Insulated wire and cable
- Transformers and power supplies
- Batteries and storage cells
- Switchgear, connectors, and controls
- Aluminum semi-finished products
Frequently asked questions
- How much does the U.S. import from Hong Kong? U.S. imports from Hong Kong totaled $81.8M in customs value in 2025, across the 52 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Hong Kong? In 2025, imports from Hong Kong had an effective calculated-duty rate of 23.58% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 2.44%.
- What does the U.S. import most from Hong Kong? Among tracked manufacturing families, Hong Kong's largest recent categories are insulated wire and cable, transformers and power supplies, batteries and storage cells, switchgear, connectors, and controls. Each has its own live rate page linked below.
- Is the tariff burden on Hong Kong rising or falling? Rising: the effective rate on tracked imports from Hong Kong moved +21.1 points year over year to 23.58% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.