Tariff Monitor

Tariffs on Imports From North Macedonia

In 2025, U.S. importers brought in $64.0M of goods from North Macedonia across 31 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 16.43%, up from 2.02% the year before. North Macedonia's largest tracked categories: filtering and separation equipment, insulated wire and cable, switchgear, connectors, and controls. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from North Macedonia: $64.0M in 2025 across 31 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 16.43% (2.02% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from North Macedonia

  • Filtering and separation equipment
  • Insulated wire and cable
  • Switchgear, connectors, and controls
  • Capacitors, resistors, and circuit boards
  • Robots and automated machinery

Frequently asked questions

  • How much does the U.S. import from North Macedonia? U.S. imports from North Macedonia totaled $64.0M in customs value in 2025, across the 31 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from North Macedonia? In 2025, imports from North Macedonia had an effective calculated-duty rate of 16.43% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 2.02%.
  • What does the U.S. import most from North Macedonia? Among tracked manufacturing families, North Macedonia's largest recent categories are filtering and separation equipment, insulated wire and cable, switchgear, connectors, and controls, capacitors, resistors, and circuit boards. Each has its own live rate page linked below.
  • Is the tariff burden on North Macedonia rising or falling? Rising: the effective rate on tracked imports from North Macedonia moved +14.4 points year over year to 16.43% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.