Tariff Monitor
U.S. Imports of Titanium and tungsten From Italy
In 2025, U.S. importers brought in $17.7M of titanium and tungsten from Italy; the reported effective calculated-duty rate was 3.93% for that flow. That makes Italy the 15th-largest named source of this family, at 1.2% of tracked titanium and tungsten imports. The family-wide effective calculated-duty rate is 8.27%, so Italy's observed rate is 4.3 points less than average. Freight and insurance add 3.44% on top of customs value. Tracked-family figures are a floor on total bilateral trade.
The current reading
- Import value: $17.7M of titanium and tungsten from Italy in 2025, customs value.
- Observed effective calculated-duty rate: 3.93%, reported Calculated Duties ÷ covered customs value, 4.3 points below the 8.27% family average.
- Share of the family: 1.2%, #15 named source of titanium and tungsten.
- Reported freight and insurance: 3.44% of customs value, shown alongside the effective calculated-duty rate.
- History depth: 4 years of annual named-source boards.
Frequently asked questions
- What tariff does the U.S. charge on titanium and tungsten from Italy? In 2025, the reported effective calculated-duty rate was 3.93% for titanium and tungsten imported from Italy, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
- How much titanium and tungsten does the U.S. import from Italy? The U.S. imported $17.7M of titanium and tungsten from Italy in 2025, 1.2% of the tracked titanium and tungsten it imports, ranking Italy the 15th-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
- What does freight add on titanium and tungsten from Italy? Cost, insurance, and freight ran 3.44% of customs value on titanium and tungsten from Italy in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.