Tariff Monitor

Tariffs on Imports From Luxembourg

In 2025, U.S. importers brought in $221.8M of goods from Luxembourg across 48 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 20.94%, up from 1.73% the year before. Luxembourg's largest tracked categories: steel bar, rod, and wire, fabricated structural steel, aluminum semi-finished products. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Luxembourg: $221.8M in 2025 across 48 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 20.94% (1.73% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 6 years of annual named-source boards.

Largest tracked families from Luxembourg

  • Steel bar, rod, and wire
  • Fabricated structural steel
  • Aluminum semi-finished products
  • Valves and fluid controls
  • Cutting tools and inserts

Frequently asked questions

  • How much does the U.S. import from Luxembourg? U.S. imports from Luxembourg totaled $221.8M in customs value in 2025, across the 48 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Luxembourg? In 2025, imports from Luxembourg had an effective calculated-duty rate of 20.94% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 1.73%.
  • What does the U.S. import most from Luxembourg? Among tracked manufacturing families, Luxembourg's largest recent categories are steel bar, rod, and wire, fabricated structural steel, aluminum semi-finished products, valves and fluid controls. Each has its own live rate page linked below.
  • Is the tariff burden on Luxembourg rising or falling? Rising: the effective rate on tracked imports from Luxembourg moved +19.2 points year over year to 20.94% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.