Tariff Monitor

Tariffs on Imports From Serbia

In 2025, U.S. importers brought in $219.5M of goods from Serbia across 45 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 20.67%, up from 0.89% the year before. Serbia's largest tracked categories: electric motors and generators, compressors and fans, pumps for liquids. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Serbia: $219.5M in 2025 across 45 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 20.67% (0.89% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from Serbia

  • Electric motors and generators
  • Compressors and fans
  • Pumps for liquids
  • Internal combustion engines
  • Copper semi-finished products

Frequently asked questions

  • How much does the U.S. import from Serbia? U.S. imports from Serbia totaled $219.5M in customs value in 2025, across the 45 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Serbia? In 2025, imports from Serbia had an effective calculated-duty rate of 20.67% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.89%.
  • What does the U.S. import most from Serbia? Among tracked manufacturing families, Serbia's largest recent categories are electric motors and generators, compressors and fans, pumps for liquids, internal combustion engines. Each has its own live rate page linked below.
  • Is the tariff burden on Serbia rising or falling? Rising: the effective rate on tracked imports from Serbia moved +19.8 points year over year to 20.67% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.