Tariff Monitor

Tariffs on Imports From Myanmar (Burma)

In 2025, U.S. importers brought in $8.9M of goods from Myanmar (Burma) across 17 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 17.48%, up from 0.57% the year before. Myanmar (Burma)'s largest tracked categories: lamps and led lighting, transformers and power supplies, rubber materials and products. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Myanmar (Burma): $8.9M in 2025 across 17 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 17.48% (0.57% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from Myanmar (Burma)

  • Lamps and LED lighting
  • Transformers and power supplies
  • Rubber materials and products
  • Insulated wire and cable
  • Iron and steel castings and articles

Frequently asked questions

  • How much does the U.S. import from Myanmar (Burma)? U.S. imports from Myanmar (Burma) totaled $8.9M in customs value in 2025, across the 17 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Myanmar (Burma)? In 2025, imports from Myanmar (Burma) had an effective calculated-duty rate of 17.48% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.57%.
  • What does the U.S. import most from Myanmar (Burma)? Among tracked manufacturing families, Myanmar (Burma)'s largest recent categories are lamps and led lighting, transformers and power supplies, rubber materials and products, insulated wire and cable. Each has its own live rate page linked below.
  • Is the tariff burden on Myanmar (Burma) rising or falling? Rising: the effective rate on tracked imports from Myanmar (Burma) moved +16.9 points year over year to 17.48% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.