Tariff Monitor

Tariffs on Imports From Papua New Guinea

In 2025, U.S. importers brought in $39K of goods from Papua New Guinea across 4 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 19.49%, up from 0.18% the year before. Papua New Guinea's largest tracked categories: packaging and filling machinery, semiconductors and integrated circuits, internal combustion engines. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Papua New Guinea: $39K in 2025 across 4 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 19.49% (0.18% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from Papua New Guinea

  • Packaging and filling machinery
  • Semiconductors and integrated circuits
  • Internal combustion engines
  • Pumps for liquids
  • Turbines and fluid-power drives

Frequently asked questions

  • How much does the U.S. import from Papua New Guinea? U.S. imports from Papua New Guinea totaled $39K in customs value in 2025, across the 4 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Papua New Guinea? In 2025, imports from Papua New Guinea had an effective calculated-duty rate of 19.49% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.18%.
  • What does the U.S. import most from Papua New Guinea? Among tracked manufacturing families, Papua New Guinea's largest recent categories are packaging and filling machinery, semiconductors and integrated circuits, internal combustion engines, pumps for liquids. Each has its own live rate page linked below.
  • Is the tariff burden on Papua New Guinea rising or falling? Rising: the effective rate on tracked imports from Papua New Guinea moved +19.3 points year over year to 19.49% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.