Tariff Monitor
Tariffs on Imports From Republic of the Congo
In 2025, U.S. importers brought in $69K of goods from Republic of the Congo across 5 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 6.42%, up from 2.55% the year before. Republic of the Congo's largest tracked categories: plastics and rubber machinery, measuring and inspection instruments, switchgear, connectors, and controls. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Republic of the Congo: $69K in 2025 across 5 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 6.42% (2.55% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Republic of the Congo
- Plastics and rubber machinery
- Measuring and inspection instruments
- Switchgear, connectors, and controls
- Springs, chain, and wire mesh
- Pumps for liquids
Frequently asked questions
- How much does the U.S. import from Republic of the Congo? U.S. imports from Republic of the Congo totaled $69K in customs value in 2025, across the 5 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Republic of the Congo? In 2025, imports from Republic of the Congo had an effective calculated-duty rate of 6.42% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 2.55%.
- What does the U.S. import most from Republic of the Congo? Among tracked manufacturing families, Republic of the Congo's largest recent categories are plastics and rubber machinery, measuring and inspection instruments, switchgear, connectors, and controls, springs, chain, and wire mesh. Each has its own live rate page linked below.
- Is the tariff burden on Republic of the Congo rising or falling? Rising: the effective rate on tracked imports from Republic of the Congo moved +3.9 points year over year to 6.42% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.