Tariff Monitor
Tariffs on Imports From Central African Republic
In 2025, U.S. importers brought in $63K of goods from Central African Republic across 2 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 0%, down from 4.03% the year before. Central African Republic's largest tracked categories: plastics in primary forms, robots and automated machinery, measuring and inspection instruments. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Central African Republic: $63K in 2025 across 2 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 0% (4.03% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Central African Republic
- Plastics in primary forms
- Robots and automated machinery
- Measuring and inspection instruments
- Turbines and fluid-power drives
- Transformers and power supplies
Frequently asked questions
- How much does the U.S. import from Central African Republic? U.S. imports from Central African Republic totaled $63K in customs value in 2025, across the 2 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Central African Republic? In 2025, imports from Central African Republic had an effective calculated-duty rate of 0% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 4.03%.
- What does the U.S. import most from Central African Republic? Among tracked manufacturing families, Central African Republic's largest recent categories are plastics in primary forms, robots and automated machinery, measuring and inspection instruments, turbines and fluid-power drives. Each has its own live rate page linked below.
- Is the tariff burden on Central African Republic rising or falling? Falling: the effective rate on tracked imports from Central African Republic moved -4 points year over year to 0% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.