Tariff Monitor

Tariffs on Imports From Saint Kitts and Nevis

In 2025, U.S. importers brought in $12.3M of goods from Saint Kitts and Nevis across 18 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 4.94%, up from 0.31% the year before. Saint Kitts and Nevis's largest tracked categories: measuring and inspection instruments, switchgear, connectors, and controls, transformers and power supplies. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Saint Kitts and Nevis: $12.3M in 2025 across 18 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 4.94% (0.31% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from Saint Kitts and Nevis

  • Measuring and inspection instruments
  • Switchgear, connectors, and controls
  • Transformers and power supplies
  • Capacitors, resistors, and circuit boards
  • Plastics in primary forms

Frequently asked questions

  • How much does the U.S. import from Saint Kitts and Nevis? U.S. imports from Saint Kitts and Nevis totaled $12.3M in customs value in 2025, across the 18 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Saint Kitts and Nevis? In 2025, imports from Saint Kitts and Nevis had an effective calculated-duty rate of 4.94% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.31%.
  • What does the U.S. import most from Saint Kitts and Nevis? Among tracked manufacturing families, Saint Kitts and Nevis's largest recent categories are measuring and inspection instruments, switchgear, connectors, and controls, transformers and power supplies, capacitors, resistors, and circuit boards. Each has its own live rate page linked below.
  • Is the tariff burden on Saint Kitts and Nevis rising or falling? Rising: the effective rate on tracked imports from Saint Kitts and Nevis moved +4.6 points year over year to 4.94% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.