Tariff Monitor
Tariffs on Imports From Saint Lucia
In 2025, U.S. importers brought in $942K of goods from Saint Lucia across 6 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 10.91%, up from 0% the year before. Saint Lucia's largest tracked categories: turbines and fluid-power drives, robots and automated machinery, switchgear, connectors, and controls. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Saint Lucia: $942K in 2025 across 6 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 10.91% (0% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Saint Lucia
- Turbines and fluid-power drives
- Robots and automated machinery
- Switchgear, connectors, and controls
- Semiconductors and integrated circuits
- Capacitors, resistors, and circuit boards
Frequently asked questions
- How much does the U.S. import from Saint Lucia? U.S. imports from Saint Lucia totaled $942K in customs value in 2025, across the 6 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Saint Lucia? In 2025, imports from Saint Lucia had an effective calculated-duty rate of 10.91% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0%.
- What does the U.S. import most from Saint Lucia? Among tracked manufacturing families, Saint Lucia's largest recent categories are turbines and fluid-power drives, robots and automated machinery, switchgear, connectors, and controls, semiconductors and integrated circuits. Each has its own live rate page linked below.
- Is the tariff burden on Saint Lucia rising or falling? Rising: the effective rate on tracked imports from Saint Lucia moved +10.9 points year over year to 10.91% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.