Tariff Monitor

Tariffs on Imports From Saint Vincent and the Grenadines

In 2024, U.S. importers brought in $22K of goods from Saint Vincent and the Grenadines across 4 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 0.58%. Saint Vincent and the Grenadines's largest tracked categories: compressors and fans, insulated wire and cable, batteries and storage cells. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Saint Vincent and the Grenadines: $22K in 2024 across 4 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 0.58%, reported Calculated Duties ÷ covered customs value.
  • History depth: 1 years of annual named-source boards.

Largest tracked families from Saint Vincent and the Grenadines

  • Compressors and fans
  • Insulated wire and cable
  • Batteries and storage cells
  • Valves and fluid controls

Frequently asked questions

  • How much does the U.S. import from Saint Vincent and the Grenadines? U.S. imports from Saint Vincent and the Grenadines totaled $22K in customs value in 2024, across the 4 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Saint Vincent and the Grenadines? In 2024, imports from Saint Vincent and the Grenadines had an effective calculated-duty rate of 0.58% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics.
  • What does the U.S. import most from Saint Vincent and the Grenadines? Among tracked manufacturing families, Saint Vincent and the Grenadines's largest recent categories are compressors and fans, insulated wire and cable, batteries and storage cells, valves and fluid controls. Each has its own live rate page linked below.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.