Tariff Monitor

Tariffs on Imports From South Sudan

In 2024, U.S. importers brought in $18K of goods from South Sudan across 1 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 0%. South Sudan's largest tracked categories: semiconductor and display equipment. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from South Sudan: $18K in 2024 across 1 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 0%, reported Calculated Duties ÷ covered customs value.
  • History depth: 1 years of annual named-source boards.

Largest tracked families from South Sudan

  • Semiconductor and display equipment

Frequently asked questions

  • How much does the U.S. import from South Sudan? U.S. imports from South Sudan totaled $18K in customs value in 2024, across the 1 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from South Sudan? In 2024, imports from South Sudan had an effective calculated-duty rate of 0% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.