Tariff Monitor

U.S. Imports of Aluminum semi-finished products From Saudi Arabia

In 2025, U.S. importers brought in $229.9M of aluminum semi-finished products from Saudi Arabia; the reported effective calculated-duty rate was 20.99% for that flow. That makes Saudi Arabia the 9th-largest named source of this family, at 3% of tracked aluminum semi-finished products imports. The family-wide effective calculated-duty rate is 32.81%, so Saudi Arabia's observed rate is 11.8 points less than average. Freight and insurance add 8.4% on top of customs value. Tracked-family figures are a floor on total bilateral trade.

The current reading

  • Import value: $229.9M of aluminum semi-finished products from Saudi Arabia in 2025, customs value.
  • Observed effective calculated-duty rate: 20.99%, reported Calculated Duties ÷ covered customs value, 11.8 points below the 32.81% family average.
  • Share of the family: 3%, #9 named source of aluminum semi-finished products.
  • Reported freight and insurance: 8.4% of customs value, shown alongside the effective calculated-duty rate.
  • History depth: 4 years of annual named-source boards.

Frequently asked questions

  • What tariff does the U.S. charge on aluminum semi-finished products from Saudi Arabia? In 2025, the reported effective calculated-duty rate was 20.99% for aluminum semi-finished products imported from Saudi Arabia, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
  • How much aluminum semi-finished products does the U.S. import from Saudi Arabia? The U.S. imported $229.9M of aluminum semi-finished products from Saudi Arabia in 2025, 3% of the tracked aluminum semi-finished products it imports, ranking Saudi Arabia the 9th-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
  • What does freight add on aluminum semi-finished products from Saudi Arabia? Cost, insurance, and freight ran 8.4% of customs value on aluminum semi-finished products from Saudi Arabia in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.