Tariff Monitor
Tariffs on Imports From Saudi Arabia
In 2025, U.S. importers brought in $442.2M of goods from Saudi Arabia across 42 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 15.8%, up from 7.18% the year before. Saudi Arabia's largest tracked categories: aluminum semi-finished products, titanium and tungsten, plastic semi-finished products. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Saudi Arabia: $442.2M in 2025 across 42 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 15.8% (7.18% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 5 years of annual named-source boards.
Largest tracked families from Saudi Arabia
- Aluminum semi-finished products
- Titanium and tungsten
- Plastic semi-finished products
- Plastics in primary forms
- Rubber materials and products
Frequently asked questions
- How much does the U.S. import from Saudi Arabia? U.S. imports from Saudi Arabia totaled $442.2M in customs value in 2025, across the 42 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Saudi Arabia? In 2025, imports from Saudi Arabia had an effective calculated-duty rate of 15.8% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 7.18%.
- What does the U.S. import most from Saudi Arabia? Among tracked manufacturing families, Saudi Arabia's largest recent categories are aluminum semi-finished products, titanium and tungsten, plastic semi-finished products, plastics in primary forms. Each has its own live rate page linked below.
- Is the tariff burden on Saudi Arabia rising or falling? Rising: the effective rate on tracked imports from Saudi Arabia moved +8.6 points year over year to 15.8% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.