Tariff Monitor
Tariffs on Imports From Singapore
In 2025, U.S. importers brought in $4.8B of goods from Singapore across 56 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 4.48%, up from 0.34% the year before. Singapore's largest tracked categories: semiconductor and display equipment, turbines and fluid-power drives, semiconductors and integrated circuits. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Singapore: $4.8B in 2025 across 56 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 4.48% (0.34% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 12 years of annual named-source boards.
Largest tracked families from Singapore
- Semiconductor and display equipment
- Turbines and fluid-power drives
- Semiconductors and integrated circuits
- Switchgear, connectors, and controls
- Measuring and inspection instruments
Frequently asked questions
- How much does the U.S. import from Singapore? U.S. imports from Singapore totaled $4.8B in customs value in 2025, across the 56 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Singapore? In 2025, imports from Singapore had an effective calculated-duty rate of 4.48% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.34%.
- What does the U.S. import most from Singapore? Among tracked manufacturing families, Singapore's largest recent categories are semiconductor and display equipment, turbines and fluid-power drives, semiconductors and integrated circuits, switchgear, connectors, and controls. Each has its own live rate page linked below.
- Is the tariff burden on Singapore rising or falling? Rising: the effective rate on tracked imports from Singapore moved +4.1 points year over year to 4.48% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.