Tariff Monitor

Tariffs on Imports From Sint Maarten

In 2025, U.S. importers brought in $120K of goods from Sint Maarten across 6 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 11.6%, up from 0.09% the year before. Sint Maarten's largest tracked categories: electric motors and generators, turbines and fluid-power drives, hand tools. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Sint Maarten: $120K in 2025 across 6 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 11.6% (0.09% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from Sint Maarten

  • Electric motors and generators
  • Turbines and fluid-power drives
  • Hand tools
  • Transformers and power supplies
  • Iron and steel castings and articles

Frequently asked questions

  • How much does the U.S. import from Sint Maarten? U.S. imports from Sint Maarten totaled $120K in customs value in 2025, across the 6 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Sint Maarten? In 2025, imports from Sint Maarten had an effective calculated-duty rate of 11.6% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.09%.
  • What does the U.S. import most from Sint Maarten? Among tracked manufacturing families, Sint Maarten's largest recent categories are electric motors and generators, turbines and fluid-power drives, hand tools, transformers and power supplies. Each has its own live rate page linked below.
  • Is the tariff burden on Sint Maarten rising or falling? Rising: the effective rate on tracked imports from Sint Maarten moved +11.5 points year over year to 11.6% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.