Tariff Monitor
Tariffs on Imports From Turkmenistan
In 2025, U.S. importers brought in $95K of goods from Turkmenistan across 3 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 7.66%, up from 1.74% the year before. Turkmenistan's largest tracked categories: filtering and separation equipment, measuring and inspection instruments, switchgear, connectors, and controls. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Turkmenistan: $95K in 2025 across 3 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 7.66% (1.74% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Turkmenistan
- Filtering and separation equipment
- Measuring and inspection instruments
- Switchgear, connectors, and controls
- Rubber materials and products
- Gaskets and mechanical seals
Frequently asked questions
- How much does the U.S. import from Turkmenistan? U.S. imports from Turkmenistan totaled $95K in customs value in 2025, across the 3 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Turkmenistan? In 2025, imports from Turkmenistan had an effective calculated-duty rate of 7.66% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 1.74%.
- What does the U.S. import most from Turkmenistan? Among tracked manufacturing families, Turkmenistan's largest recent categories are filtering and separation equipment, measuring and inspection instruments, switchgear, connectors, and controls, rubber materials and products. Each has its own live rate page linked below.
- Is the tariff burden on Turkmenistan rising or falling? Rising: the effective rate on tracked imports from Turkmenistan moved +5.9 points year over year to 7.66% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.