Tariff Monitor
Tariffs on Imports From Solomon Islands
In 2025, U.S. importers brought in $11K of goods from Solomon Islands across 3 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 13.62%, up from 3.5% the year before. Solomon Islands's largest tracked categories: adhesives and sealants, insulated wire and cable, plastic semi-finished products. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Solomon Islands: $11K in 2025 across 3 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 13.62% (3.5% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Solomon Islands
- Adhesives and sealants
- Insulated wire and cable
- Plastic semi-finished products
- Rubber materials and products
- Pumps for liquids
Frequently asked questions
- How much does the U.S. import from Solomon Islands? U.S. imports from Solomon Islands totaled $11K in customs value in 2025, across the 3 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Solomon Islands? In 2025, imports from Solomon Islands had an effective calculated-duty rate of 13.62% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 3.5%.
- What does the U.S. import most from Solomon Islands? Among tracked manufacturing families, Solomon Islands's largest recent categories are adhesives and sealants, insulated wire and cable, plastic semi-finished products, rubber materials and products. Each has its own live rate page linked below.
- Is the tariff burden on Solomon Islands rising or falling? Rising: the effective rate on tracked imports from Solomon Islands moved +10.1 points year over year to 13.62% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.