Tariff Monitor

Tariffs on Imports From United Arab Emirates

In 2025, U.S. importers brought in $1.2B of goods from United Arab Emirates across 57 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 14.4%, up from 4.64% the year before. United Arab Emirates's largest tracked categories: fabricated structural steel, steel pipe and tube, switchgear, connectors, and controls. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from United Arab Emirates: $1.2B in 2025 across 57 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 14.4% (4.64% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 6 years of annual named-source boards.

Largest tracked families from United Arab Emirates

  • Fabricated structural steel
  • Steel pipe and tube
  • Switchgear, connectors, and controls
  • Steel flat-rolled products
  • Heat exchange and process heating

Frequently asked questions

  • How much does the U.S. import from United Arab Emirates? U.S. imports from United Arab Emirates totaled $1.2B in customs value in 2025, across the 57 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from United Arab Emirates? In 2025, imports from United Arab Emirates had an effective calculated-duty rate of 14.4% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 4.64%.
  • What does the U.S. import most from United Arab Emirates? Among tracked manufacturing families, United Arab Emirates's largest recent categories are fabricated structural steel, steel pipe and tube, switchgear, connectors, and controls, steel flat-rolled products. Each has its own live rate page linked below.
  • Is the tariff burden on United Arab Emirates rising or falling? Rising: the effective rate on tracked imports from United Arab Emirates moved +9.8 points year over year to 14.4% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.