Tariff Monitor
Tariffs on Imports From Nicaragua
In 2025, U.S. importers brought in $818.7M of goods from Nicaragua across 17 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 16.92%, up from 0.05% the year before. Nicaragua's largest tracked categories: insulated wire and cable, plastics in primary forms, filtering and separation equipment. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Nicaragua: $818.7M in 2025 across 17 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 16.92% (0.05% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 12 years of annual named-source boards.
Largest tracked families from Nicaragua
- Insulated wire and cable
- Plastics in primary forms
- Filtering and separation equipment
- Switchgear, connectors, and controls
- Gears and power transmission
Frequently asked questions
- How much does the U.S. import from Nicaragua? U.S. imports from Nicaragua totaled $818.7M in customs value in 2025, across the 17 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Nicaragua? In 2025, imports from Nicaragua had an effective calculated-duty rate of 16.92% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.05%.
- What does the U.S. import most from Nicaragua? Among tracked manufacturing families, Nicaragua's largest recent categories are insulated wire and cable, plastics in primary forms, filtering and separation equipment, switchgear, connectors, and controls. Each has its own live rate page linked below.
- Is the tariff burden on Nicaragua rising or falling? Rising: the effective rate on tracked imports from Nicaragua moved +16.9 points year over year to 16.92% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.