Tariff Monitor
U.S. Imports of Iron and steel castings and articles From United Kingdom
In 2025, U.S. importers brought in $124.4M of iron and steel castings and articles from United Kingdom; the reported effective calculated-duty rate was 18.29% for that flow. That makes United Kingdom the 11th-largest named source of this family, at 2.1% of tracked iron and steel castings and articles imports. The family-wide effective calculated-duty rate is 34.54%, so United Kingdom's observed rate is 16.3 points less than average. Freight and insurance add 3.96% on top of customs value. Tracked-family figures are a floor on total bilateral trade.
The current reading
- Import value: $124.4M of iron and steel castings and articles from United Kingdom in 2025, customs value.
- Observed effective calculated-duty rate: 18.29%, reported Calculated Duties ÷ covered customs value, 16.3 points below the 34.54% family average.
- Share of the family: 2.1%, #11 named source of iron and steel castings and articles.
- Reported freight and insurance: 3.96% of customs value, shown alongside the effective calculated-duty rate.
- History depth: 5 years of annual named-source boards.
Frequently asked questions
- What tariff does the U.S. charge on iron and steel castings and articles from United Kingdom? In 2025, the reported effective calculated-duty rate was 18.29% for iron and steel castings and articles imported from United Kingdom, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
- How much iron and steel castings and articles does the U.S. import from United Kingdom? The U.S. imported $124.4M of iron and steel castings and articles from United Kingdom in 2025, 2.1% of the tracked iron and steel castings and articles it imports, ranking United Kingdom the 11th-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
- What does freight add on iron and steel castings and articles from United Kingdom? Cost, insurance, and freight ran 3.96% of customs value on iron and steel castings and articles from United Kingdom in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.