Tariff Monitor

Tariffs on Imports From Botswana

In 2025, U.S. importers brought in $327K of goods from Botswana across 9 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 12.4%, up from 2.42% the year before. Botswana's largest tracked categories: gears and power transmission, pumps for liquids, plastic semi-finished products. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Botswana: $327K in 2025 across 9 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 12.4% (2.42% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from Botswana

  • Gears and power transmission
  • Pumps for liquids
  • Plastic semi-finished products
  • Switchgear, connectors, and controls
  • Internal combustion engines

Frequently asked questions

  • How much does the U.S. import from Botswana? U.S. imports from Botswana totaled $327K in customs value in 2025, across the 9 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Botswana? In 2025, imports from Botswana had an effective calculated-duty rate of 12.4% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 2.42%.
  • What does the U.S. import most from Botswana? Among tracked manufacturing families, Botswana's largest recent categories are gears and power transmission, pumps for liquids, plastic semi-finished products, switchgear, connectors, and controls. Each has its own live rate page linked below.
  • Is the tariff burden on Botswana rising or falling? Rising: the effective rate on tracked imports from Botswana moved +10 points year over year to 12.4% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.