Tariff monitor · Machinery & Equipment

Filtering and Separation Equipment: Statutory & Effective Tariff Rates

USITC Column 1 General rates for 14 filtering and separation equipment HTS lines (parseable range 0%–2.5%).

The short answer

  • The observed effective calculated-duty rate on U.S. imports of filtering and separation equipment was 8.97% in Aug 2026, down from 11.67% a year earlier — USITC Calculated Duties divided by covered customs value. The Column 1 General line-rate range is 0%–2.5% across 14 HTS lines in the 2026 schedule; individual lines are called “Free” only when the official General field is literally Free, which still does not determine a shipment’s final duty. Mexico is the largest source, holding 30% of 2025 imports.

Statutory rates from the schedule

  • Centrifuges, filters, and purifiers for liquids and gases — clarifying coolant, air, oil, and process streams. This family covers HTS heading 8421: 14 eight-digit rate lines with a parseable Column 1 General range of 0%–2.5% in the 2026 schedule. “Free” means the official General field is literally Free for that line; it does not determine final entry liability.
  • Chapter 99 references on individual lines (for example, 9903.90.08) identify provisions to review; applicability and any additional duty depend on the entry facts.

Observed calculated-duty data

  • Latest month on record (2026-08): 8.97% effective on $1.4B of imports, versus 11.67% in the same month a year earlier. The monthly archive holds 44 observations from 2023-01 through 2026-08.
  • In 2025, U.S. imports for consumption in this family totaled $14.0B in customs value, with $1.3B in USITC reported calculated duty on $14.0B of covered customs value: an effective calculated-duty rate of 9.58%. The aggregate reflects the recorded entry mix but does not attribute the result to a specific legal provision.
  • A year earlier the effective calculated-duty rate was 2.25%, so the observed rate rose 7.3 points.
  • Top source countries in 2025: Mexico ($4.2B at 2.74%), Canada ($1.5B at 1.16%), Germany ($1.5B at 8.93%), China ($1.3B at 42.84%), South Korea ($601.1M at 7.92%).
  • Reported freight and insurance equaled 2.76% of covered customs value in 2025 ($387.7M total), from USITC DataWeb. It is shown alongside the effective calculated-duty rate and is not part of the customs-value duty base.

Representative rate lines

  • 8421.11.00.00: Cream separators · MFN Free
  • 8421.12.00.00: Clothes-dryers · MFN Free
  • 8421.19.00.00: Other · MFN 1.3%
  • 8421.21.00.00: For filtering or purifying water · MFN Free
  • 8421.22.00.00: For filtering or purifying beverages other than water · MFN Free
  • 8421.23.00.00: Oil or fuel filters for internal combustion engines · MFN 2.5%
  • 8421.29.00: Other · MFN Free
  • 8421.31.00.00: Intake air filters for internal combustion engines · MFN 2.5%

Frequently asked questions

  • What is the U.S. tariff rate on filtering and separation equipment? USITC calculated duties imply an effective rate of 8.97% in Aug 2026 (calculated duties ÷ covered customs value, USITC DataWeb). The parseable Column 1 General line-rate range is 0%–2.5%; individual lines are called “Free” only when the official General field is literally Free, and product, origin, preference and tariff mix can contribute to the observed-rate difference.
  • What are the statutory MFN line rates for filtering and separation equipment? The parseable Column 1 General line-rate range is 0%–2.5% across the family's 14 eight-digit HTS lines in the 2026 Harmonized Tariff Schedule (headings 8421). “Free” means the official General field is literally Free for a line; it does not determine final entry liability.
  • Which countries supply the most filtering and separation equipment to the U.S.? Top retained sources in 2025: Mexico ($4.2B at 2.74%), Canada ($1.5B at 1.16%), Germany ($1.5B at 8.93%). Mexico holds 30% of total family import customs value. Retained sources cover 78.2%; their HHI is 1270, a lower bound whose floor falls in the diversified range without classifying the omitted tail.
  • How much filtering and separation equipment does the U.S. import? $14.0B of customs value in 2025, with $1.3B in USITC Calculated Duties — an effective calculated-duty rate of 9.58%.
  • Is the U.S. a net importer of filtering and separation equipment? Yes — a net importer in 2025: $14.0B imported vs $10.6B exported (exports are 76% of imports).

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-08.