Plant Utilities calculator
Wastewater Surcharge Cost Calculator
Estimate one pollutant’s excess-strength surcharge using the applicable concentration allowance and local rate.
What this calculator does
- Estimate one pollutant’s excess-strength surcharge using the applicable concentration allowance and local rate.
Formula used
- Excess pounds = million gallons × 8.34 × maximum of zero and excess mg/L
- Pollutant surcharge = excess pounds × local rate per pound
- Total = pollutant surcharge + separate sampling cost
Inputs explained
- Billed Discharge Volume: Discharge volume in millions of US gallons for the period.
- Measured Pollutant Concentration: Billing-period concentration measured by the required sampling method.
- Included Concentration: Concentration allowance stated in your sewer tariff.
- Excess Pollutant Rate: Local charge per pound above the included concentration.
- Sampling and Compliance Cost: Separate sampling expense not included in the pollutant tariff.
How to use the result
- Best suited to wastewater surcharge cost review, measured pollutant concentration sensitivity.
- Base sewer charges, other pollutants and noncompliance penalties are excluded.
Current U.S. benchmarks
- Industrial electricity averages 9.64 cents per kWh across the U.S. (EIA, Aug 2026), up 7.3% from a year earlier. Energy-intensive steps carry this directly into unit cost.
Common questions
- Is this a universal sewer formula? No. It applies when your tariff bills excess pollutant pounds above a concentration allowance. Check the actual tariff structure.
- Why use 8.34? It approximately converts million US gallons times milligrams per liter into pounds of pollutant.
- Can concentration below the allowance create a credit? No. Excess concentration is floored at zero. Sampling expense may still remain.
- Can I combine several pollutants into one concentration? No. Pollutants can have different allowances and rates. Calculate each separately under the tariff’s rules.
Last reviewed 2026-10-13.