PLM, BOM & Digital Thread calculator

Configurable BOM Complexity Calculator

Rate an option combination in a configurable bill of materials by the cost of building it wrong, how often that happens and how hard it is to see. The product of the ratings is compared with your threshold.

What this calculator does

  • Risk priority number for a wrong configured variant, from severity, occurrence and detection ratings, against your action threshold.

Formula used

  • Configurable BOM risk score = configuration error severity × occurrence × detection difficulty
  • Share of the highest possible score (%) = score ÷ 1,000 × 100
  • Score below action threshold = action threshold − score

Inputs explained

  • Configuration Error Severity: Impact of building a wrong configured variant, 1 to 10.
  • Configuration Error Occurrence: How often configuration errors happen, 1 to 10.
  • Configuration Error Detection Difficulty: How hard the error is to see before build, 1 to 10.
  • Action Threshold: Score at or above which you act.

How to use the result

  • Best suited to deciding where to add configurator rules, reviewing a variant that shipped wrong.
  • Ordinal ratings multiply into a rank, not a probability. Does not count the variants in the catalog.

Common questions

  • What is a configuration error? A configured BOM that resolves to parts that do not fit, work or ship together: a voltage option with the wrong cable, a size with an impossible mount.
  • How do I rate occurrence? From order history: how often this combination has resolved wrong, 1 for never in years up to 10 for most orders.
  • Why is the V1 score different? V1 reported a weighted average on a 1 to 10 scale under a formula line that said product. V2 publishes the product, so the two figures are not comparable.
  • What threshold should I set? The score at which your configurator team adds a rule or a validation step. The 100 default is an example only.

Last reviewed 2026-10-28.