Manufacturing Economy Monitor
Paper Products Manufacturing
Paper Products manufacturing produced $70.9B of value added in 2025. That is 2.4% of all U.S. manufacturing output and 0.2% of GDP, making it the 14th-largest of the 19 manufacturing subsectors the Bureau of Economic Analysis tracks. Output grew 2.8% year over year. It is classed as nondurable goods manufacturing; the largest producing state is Wisconsin ($5.9B in 2025).
Output and growth
- Value added: $70.9B in 2025, 2.4% of all U.S. manufacturing and 0.2% of GDP.
- Year-over-year change: +2.8% in dollar terms.
- Classification: nondurable goods manufacturing (BEA subsector 322).
Top producing states
- Wisconsin: $5.9B (2025)
- Georgia: $5.3B (2025)
- Texas: $4.7B (2025)
Frequently asked questions
- How big is paper products manufacturing in the U.S.? Paper Products manufacturing produced $70.9B of value added in 2025, or 2.4% of all U.S. manufacturing output and 0.2% of total GDP, per BEA GDP-by-industry data. It ranks 14 of 19 manufacturing subsectors by size.
- Is paper products manufacturing growing or shrinking? In the latest annual data (2025), paper products value added is up 2.8% year over year in dollar terms. The full quarterly series since 2005 is charted above and updates with each BEA release.
- Which states produce the most paper products? Wisconsin leads with $5.9B of paper products GDP in 2025, followed by Georgia ($5.3B) and Texas ($4.7B), per BEA state GDP data.
- Is paper products a durable or nondurable goods industry? BEA classes paper products manufacturing as nondurable goods. Nondurable goods (food, chemicals, plastics, fuel, paper) are products generally consumed within three years.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.