Manufacturing Economy Monitor

Wood Products Manufacturing

Wood Products manufacturing produced $55.5B of value added in 2025. That is 1.9% of all U.S. manufacturing output and 0.2% of GDP, making it the 15th-largest of the 19 manufacturing subsectors the Bureau of Economic Analysis tracks. Output grew 0.2% year over year. It is classed as durable goods manufacturing; the largest producing state is Texas ($5.1B in 2025).

Output and growth

  • Value added: $55.5B in 2025, 1.9% of all U.S. manufacturing and 0.2% of GDP.
  • Year-over-year change: +0.2% in dollar terms.
  • Classification: durable goods manufacturing (BEA subsector 321).

Top producing states

  • Texas: $5.1B (2025)
  • Georgia: $3.5B (2025)
  • Oregon: $3.2B (2025)

Frequently asked questions

  • How big is wood products manufacturing in the U.S.? Wood Products manufacturing produced $55.5B of value added in 2025, or 1.9% of all U.S. manufacturing output and 0.2% of total GDP, per BEA GDP-by-industry data. It ranks 15 of 19 manufacturing subsectors by size.
  • Is wood products manufacturing growing or shrinking? In the latest annual data (2025), wood products value added is up 0.2% year over year in dollar terms. The full quarterly series since 2005 is charted above and updates with each BEA release.
  • Which states produce the most wood products? Texas leads with $5.1B of wood products GDP in 2025, followed by Georgia ($3.5B) and Oregon ($3.2B), per BEA state GDP data.
  • Is wood products a durable or nondurable goods industry? BEA classes wood products manufacturing as durable goods. Durable goods (metals, machinery, electronics, vehicles) are products with a service life of three years or more.

About this data

  • Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.

Last reviewed 2026-10-01.