Manufacturing Economy Monitor
Primary Metals Manufacturing
Primary Metals manufacturing produced $77.8B of value added in 2025. That is 2.7% of all U.S. manufacturing output and 0.3% of GDP, making it the 13th-largest of the 19 manufacturing subsectors the Bureau of Economic Analysis tracks. Output shrank 1.0% year over year. It is classed as durable goods manufacturing; the largest producing state is Indiana ($9.3B in 2025).
Output and growth
- Value added: $77.8B in 2025, 2.7% of all U.S. manufacturing and 0.3% of GDP.
- Year-over-year change: -1% in dollar terms.
- Classification: durable goods manufacturing (BEA subsector 331).
Top producing states
- Indiana: $9.3B (2025)
- Alabama: $7.1B (2025)
- Ohio: $6.6B (2025)
Frequently asked questions
- How big is primary metals manufacturing in the U.S.? Primary Metals manufacturing produced $77.8B of value added in 2025, or 2.7% of all U.S. manufacturing output and 0.3% of total GDP, per BEA GDP-by-industry data. It ranks 13 of 19 manufacturing subsectors by size.
- Is primary metals manufacturing growing or shrinking? In the latest annual data (2025), primary metals value added is down 1.0% year over year in dollar terms. The full quarterly series since 2005 is charted above and updates with each BEA release.
- Which states produce the most primary metals? Indiana leads with $9.3B of primary metals GDP in 2025, followed by Alabama ($7.1B) and Ohio ($6.6B), per BEA state GDP data.
- Is primary metals a durable or nondurable goods industry? BEA classes primary metals manufacturing as durable goods. Durable goods (metals, machinery, electronics, vehicles) are products with a service life of three years or more.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.