Manufacturing Economy Monitor

Manufacturing in Arkansas

Manufacturing contributed $25.1B to Arkansas's economy in 2025 (12.8% of the state's GDP), ranking Arkansas #32 of 50 states and DC by manufacturing output, per the Bureau of Economic Analysis. Output fell 0.2% year over year (-0.3% after inflation). The state's largest manufacturing industry is food, beverage, and tobacco products ($6.6B in 2025).

Output and rank

  • Manufacturing GDP: $25.1B in 2025, #32 of 50 states and DC.
  • Share of the state economy: 12.8% of Arkansas's GDP.
  • Growth: -0.2% year over year (-0.3% after inflation).
  • Composition: $12.5B durable goods, $12.6B nondurable goods.

Largest manufacturing industries in Arkansas

  • Food, Beverage, and Tobacco Products: $6.6B (2025)
  • Primary Metals: $2.9B (2025)
  • Fabricated Metal Products: $2.4B (2025)

Frequently asked questions

  • How big is manufacturing in Arkansas? Manufacturing contributed $25.1B to Arkansas's economy in 2025, ranking #32 of 50 states and DC, per BEA state GDP data.
  • What share of Arkansas's economy is manufacturing? Manufacturing is 12.8% of Arkansas's GDP in 2025. Nationally, manufacturing averages 9.5% of GDP, so Arkansas is more manufacturing-intensive than the country as a whole.
  • What is the largest manufacturing industry in Arkansas? Food, Beverage, and Tobacco Products leads at $6.6B (2025), followed by primary metals ($2.9B) and fabricated metal products ($2.4B), per BEA state GDP by industry.
  • Is manufacturing in Arkansas growing? Arkansas's manufacturing GDP is down 0.2% year over year in dollar terms and down 0.3% after inflation, per the latest BEA annual data (2025).
  • Does Arkansas make more durable or nondurable goods? Nondurable goods lead in Arkansas: $12.6B versus $12.5B of value added in 2025.

About this data

  • Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.

Last reviewed 2026-10-01.