Manufacturing Economy Monitor

Manufacturing in Mississippi

Manufacturing contributed $24.2B to Mississippi's economy in 2025 (14.9% of the state's GDP), ranking Mississippi #34 of 50 states and DC by manufacturing output, per the Bureau of Economic Analysis. Output fell 0.3% year over year (+0.4% after inflation). The state's largest manufacturing industry is petroleum and coal products ($5.1B in 2025).

Output and rank

  • Manufacturing GDP: $24.2B in 2025, #34 of 50 states and DC.
  • Share of the state economy: 14.9% of Mississippi's GDP.
  • Growth: -0.3% year over year (+0.4% after inflation).
  • Composition: $12.1B durable goods, $12.1B nondurable goods.

Largest manufacturing industries in Mississippi

  • Petroleum and Coal Products: $5.1B (2025)
  • Food, Beverage, and Tobacco Products: $2.3B (2025)
  • Chemical Products: $2.2B (2025)

Frequently asked questions

  • How big is manufacturing in Mississippi? Manufacturing contributed $24.2B to Mississippi's economy in 2025, ranking #34 of 50 states and DC, per BEA state GDP data.
  • What share of Mississippi's economy is manufacturing? Manufacturing is 14.9% of Mississippi's GDP in 2025. Nationally, manufacturing averages 9.5% of GDP, so Mississippi is more manufacturing-intensive than the country as a whole.
  • What is the largest manufacturing industry in Mississippi? Petroleum and Coal Products leads at $5.1B (2025), followed by food, beverage, and tobacco products ($2.3B) and chemical products ($2.2B), per BEA state GDP by industry.
  • Is manufacturing in Mississippi growing? Mississippi's manufacturing GDP is down 0.3% year over year in dollar terms and up 0.4% after inflation, per the latest BEA annual data (2025).
  • Does Mississippi make more durable or nondurable goods? Nondurable goods lead in Mississippi: $12.1B versus $12.1B of value added in 2025.

About this data

  • Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.

Last reviewed 2026-10-01.