Manufacturing Economy Monitor
Fabricated Metal Products Manufacturing in Colorado
Fabricated Metal Products manufacturing added $1.5B of value to Colorado's economy in 2025, up 1.7% year over year. That ranks Colorado 33rd of 50 states and DC for this industry. It is 5.2% of Colorado's manufacturing output. Nationally, fabricated metal products is a $199B industry (the 6th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $1.5B in 2025, #33 of 50 states and DC for this industry.
- Growth: +1.7% year over year.
- Share of Colorado's manufacturing: 5.2% of the state's total manufacturing value added.
- National context: fabricated metal products is a $199B industry nationally, #6 of the 19 manufacturing subsectors (+1.3% year over year).
- Classification: durable goods manufacturing (BEA subsector 332).
Frequently asked questions
- How big is the fabricated metal products industry in Colorado? Fabricated Metal Products added $1.5B of value in Colorado in 2025, ranking the state 33rd of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is fabricated metal products growing in Colorado? Colorado's fabricated metal products output grew 1.7% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of Colorado's manufacturing is fabricated metal products? Fabricated Metal Products is 5.2% of Colorado's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.