Manufacturing Economy Monitor

Miscellaneous Manufacturing Manufacturing in Connecticut

Miscellaneous Manufacturing manufacturing added $2.4B of value to Connecticut's economy in 2025, up 2.2% year over year. That ranks Connecticut 18th of 50 states and DC for this industry. It is 6% of Connecticut's manufacturing output. Nationally, miscellaneous manufacturing is a $119B industry (the 9th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.

Output and rank

  • Value added: $2.4B in 2025, #18 of 50 states and DC for this industry.
  • Growth: +2.2% year over year.
  • Share of Connecticut's manufacturing: 6% of the state's total manufacturing value added.
  • National context: miscellaneous manufacturing is a $119B industry nationally, #9 of the 19 manufacturing subsectors (+1.7% year over year).
  • Classification: durable goods manufacturing (BEA subsector 339).

Frequently asked questions

  • How big is the miscellaneous manufacturing industry in Connecticut? Miscellaneous Manufacturing added $2.4B of value in Connecticut in 2025, ranking the state 18th of 50 states and DC for this industry, per BEA state GDP-by-industry data.
  • Is miscellaneous manufacturing growing in Connecticut? Connecticut's miscellaneous manufacturing output grew 2.2% year over year to 2025. The chart above traces the full annual series since 1997.
  • What share of Connecticut's manufacturing is miscellaneous manufacturing? Miscellaneous Manufacturing is 6% of Connecticut's total manufacturing value added in 2025, per BEA state GDP-by-industry data.

About this data

  • Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.

Last reviewed 2026-10-01.