Manufacturing Economy Monitor

Manufacturing in Massachusetts

Manufacturing contributed $68.0B to Massachusetts's economy in 2025 (8.4% of the state's GDP), ranking Massachusetts #15 of 50 states and DC by manufacturing output, per the Bureau of Economic Analysis. Output rose 3.6% year over year (+2.4% after inflation). The state's largest manufacturing industry is chemical products ($24.6B in 2025).

Output and rank

  • Manufacturing GDP: $68.0B in 2025, #15 of 50 states and DC.
  • Share of the state economy: 8.4% of Massachusetts's GDP.
  • Growth: +3.6% year over year (+2.4% after inflation).
  • Composition: $33.4B durable goods, $34.6B nondurable goods.

Largest manufacturing industries in Massachusetts

  • Chemical Products: $24.6B (2025)
  • Computer and Electronic Products: $12.8B (2025)
  • Fabricated Metal Products: $5.1B (2025)

Frequently asked questions

  • How big is manufacturing in Massachusetts? Manufacturing contributed $68.0B to Massachusetts's economy in 2025, ranking #15 of 50 states and DC, per BEA state GDP data.
  • What share of Massachusetts's economy is manufacturing? Manufacturing is 8.4% of Massachusetts's GDP in 2025. Nationally, manufacturing averages 9.5% of GDP, so Massachusetts is less manufacturing-intensive than the national average.
  • What is the largest manufacturing industry in Massachusetts? Chemical Products leads at $24.6B (2025), followed by computer and electronic products ($12.8B) and fabricated metal products ($5.1B), per BEA state GDP by industry.
  • Is manufacturing in Massachusetts growing? Massachusetts's manufacturing GDP is up 3.6% year over year in dollar terms and up 2.4% after inflation, per the latest BEA annual data (2025).
  • Does Massachusetts make more durable or nondurable goods? Nondurable goods lead in Massachusetts: $34.6B versus $33.4B of value added in 2025.

About this data

  • Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.

Last reviewed 2026-10-01.