Manufacturing Economy Monitor
Other Transportation Equipment Manufacturing in Massachusetts
Other Transportation Equipment manufacturing added $3.0B of value to Massachusetts's economy in 2025, up 11.0% year over year. That ranks Massachusetts 15th of 50 states and DC for this industry. It is 4.4% of Massachusetts's manufacturing output. Nationally, other transportation equipment is a $202B industry (the 5th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $3.0B in 2025, #15 of 50 states and DC for this industry.
- Growth: +11% year over year.
- Share of Massachusetts's manufacturing: 4.4% of the state's total manufacturing value added.
- National context: other transportation equipment is a $202B industry nationally, #5 of the 19 manufacturing subsectors (+11.9% year over year).
- Classification: durable goods manufacturing (BEA subsector 3364OT).
Frequently asked questions
- How big is the other transportation equipment industry in Massachusetts? Other Transportation Equipment added $3.0B of value in Massachusetts in 2025, ranking the state 15th of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is other transportation equipment growing in Massachusetts? Massachusetts's other transportation equipment output grew 11.0% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of Massachusetts's manufacturing is other transportation equipment? Other Transportation Equipment is 4.4% of Massachusetts's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.