Manufacturing Economy Monitor
Nonmetallic Mineral Products Manufacturing in Mississippi
Nonmetallic Mineral Products manufacturing added $593M of value to Mississippi's economy in 2025, up 10.5% year over year. That ranks Mississippi 34th of 50 states and DC for this industry. It is 2.4% of Mississippi's manufacturing output. Nationally, nonmetallic mineral products is a $85.1B industry (the 12th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $593M in 2025, #34 of 50 states and DC for this industry.
- Growth: +10.5% year over year.
- Share of Mississippi's manufacturing: 2.4% of the state's total manufacturing value added.
- National context: nonmetallic mineral products is a $85.1B industry nationally, #12 of the 19 manufacturing subsectors (+0.4% year over year).
- Classification: durable goods manufacturing (BEA subsector 327).
Frequently asked questions
- How big is the nonmetallic mineral products industry in Mississippi? Nonmetallic Mineral Products added $593M of value in Mississippi in 2025, ranking the state 34th of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is nonmetallic mineral products growing in Mississippi? Mississippi's nonmetallic mineral products output grew 10.5% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of Mississippi's manufacturing is nonmetallic mineral products? Nonmetallic Mineral Products is 2.4% of Mississippi's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.