Manufacturing Economy Monitor
Plastics and Rubber Products Manufacturing in Mississippi
Plastics and Rubber Products manufacturing added $869M of value to Mississippi's economy in 2025, down 6.8% year over year. That ranks Mississippi 30th of 50 states and DC for this industry. It is 3.6% of Mississippi's manufacturing output. Nationally, plastics and rubber products is a $94.1B industry (the 10th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $869M in 2025, #30 of 50 states and DC for this industry.
- Growth: -6.8% year over year.
- Share of Mississippi's manufacturing: 3.6% of the state's total manufacturing value added.
- National context: plastics and rubber products is a $94.1B industry nationally, #10 of the 19 manufacturing subsectors (-1.5% year over year).
- Classification: nondurable goods manufacturing (BEA subsector 326).
Frequently asked questions
- How big is the plastics and rubber products industry in Mississippi? Plastics and Rubber Products added $869M of value in Mississippi in 2025, ranking the state 30th of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is plastics and rubber products growing in Mississippi? Mississippi's plastics and rubber products output shrank 6.8% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of Mississippi's manufacturing is plastics and rubber products? Plastics and Rubber Products is 3.6% of Mississippi's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.