Manufacturing Economy Monitor
Wood Products Manufacturing in Mississippi
Wood Products manufacturing added $1.2B of value to Mississippi's economy in 2025, up 0.9% year over year. That ranks Mississippi 20th of 50 states and DC for this industry. It is 4.8% of Mississippi's manufacturing output. Nationally, wood products is a $55.5B industry (the 15th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $1.2B in 2025, #20 of 50 states and DC for this industry.
- Growth: +0.9% year over year.
- Share of Mississippi's manufacturing: 4.8% of the state's total manufacturing value added.
- National context: wood products is a $55.5B industry nationally, #15 of the 19 manufacturing subsectors (+0.2% year over year).
- Classification: durable goods manufacturing (BEA subsector 321).
Frequently asked questions
- How big is the wood products industry in Mississippi? Wood Products added $1.2B of value in Mississippi in 2025, ranking the state 20th of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is wood products growing in Mississippi? Mississippi's wood products output grew 0.9% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of Mississippi's manufacturing is wood products? Wood Products is 4.8% of Mississippi's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.