Manufacturing Economy Monitor
Manufacturing in Texas
Manufacturing contributed $332B to Texas's economy in 2025 (11.3% of the state's GDP), ranking Texas #2 of 50 states and DC by manufacturing output, per the Bureau of Economic Analysis. Output rose 0.4% year over year (+0.8% after inflation). The state's largest manufacturing industry is chemical products ($88.6B in 2025).
Output and rank
- Manufacturing GDP: $332B in 2025, #2 of 50 states and DC.
- Share of the state economy: 11.3% of Texas's GDP.
- Growth: +0.4% year over year (+0.8% after inflation).
- Composition: $151B durable goods, $181B nondurable goods.
Largest manufacturing industries in Texas
- Chemical Products: $88.6B (2025)
- Petroleum and Coal Products: $53.2B (2025)
- Computer and Electronic Products: $31.5B (2025)
Frequently asked questions
- How big is manufacturing in Texas? Manufacturing contributed $332B to Texas's economy in 2025, ranking #2 of 50 states and DC, per BEA state GDP data.
- What share of Texas's economy is manufacturing? Manufacturing is 11.3% of Texas's GDP in 2025. Nationally, manufacturing averages 9.5% of GDP, so Texas is more manufacturing-intensive than the country as a whole.
- What is the largest manufacturing industry in Texas? Chemical Products leads at $88.6B (2025), followed by petroleum and coal products ($53.2B) and computer and electronic products ($31.5B), per BEA state GDP by industry.
- Is manufacturing in Texas growing? Texas's manufacturing GDP is up 0.4% year over year in dollar terms and up 0.8% after inflation, per the latest BEA annual data (2025).
- Does Texas make more durable or nondurable goods? Nondurable goods lead in Texas: $181B versus $151B of value added in 2025.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.