Manufacturing Economy Monitor
Manufacturing in Vermont
Manufacturing contributed $3.9B to Vermont's economy in 2025 (7.8% of the state's GDP), ranking Vermont #48 of 50 states and DC by manufacturing output, per the Bureau of Economic Analysis. Output rose 3.5% year over year (+2.6% after inflation). The state's largest manufacturing industry is food, beverage, and tobacco products ($951M in 2025).
Output and rank
- Manufacturing GDP: $3.9B in 2025, #48 of 50 states and DC.
- Share of the state economy: 7.8% of Vermont's GDP.
- Growth: +3.5% year over year (+2.6% after inflation).
- Composition: $2.4B durable goods, $1.5B nondurable goods.
Largest manufacturing industries in Vermont
- Food, Beverage, and Tobacco Products: $951M (2025)
- Computer and Electronic Products: $547M (2025)
- Other Transportation Equipment: $486M (2025)
Frequently asked questions
- How big is manufacturing in Vermont? Manufacturing contributed $3.9B to Vermont's economy in 2025, ranking #48 of 50 states and DC, per BEA state GDP data.
- What share of Vermont's economy is manufacturing? Manufacturing is 7.8% of Vermont's GDP in 2025. Nationally, manufacturing averages 9.5% of GDP, so Vermont is less manufacturing-intensive than the national average.
- What is the largest manufacturing industry in Vermont? Food, Beverage, and Tobacco Products leads at $951M (2025), followed by computer and electronic products ($547M) and other transportation equipment ($486M), per BEA state GDP by industry.
- Is manufacturing in Vermont growing? Vermont's manufacturing GDP is up 3.5% year over year in dollar terms and up 2.6% after inflation, per the latest BEA annual data (2025).
- Does Vermont make more durable or nondurable goods? Durable goods lead in Vermont: $2.4B versus $1.5B of value added in 2025.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.