Manufacturing Economy Monitor

Manufacturing in Alaska

Manufacturing contributed $1.5B to Alaska's economy in 2025 (2% of the state's GDP), ranking Alaska #50 of 50 states and DC by manufacturing output, per the Bureau of Economic Analysis. Output rose 2.7% year over year (+2.6% after inflation). The state's largest manufacturing industry is food, beverage, and tobacco products ($903M in 2025).

Output and rank

  • Manufacturing GDP: $1.5B in 2025, #50 of 50 states and DC.
  • Share of the state economy: 2% of Alaska's GDP.
  • Growth: +2.7% year over year (+2.6% after inflation).
  • Composition: $368M durable goods, $1.1B nondurable goods.

Largest manufacturing industries in Alaska

  • Food, Beverage, and Tobacco Products: $903M (2025)
  • Petroleum and Coal Products: $146M (2025)
  • Other Transportation Equipment: $124M (2025)

Frequently asked questions

  • How big is manufacturing in Alaska? Manufacturing contributed $1.5B to Alaska's economy in 2025, ranking #50 of 50 states and DC, per BEA state GDP data.
  • What share of Alaska's economy is manufacturing? Manufacturing is 2% of Alaska's GDP in 2025. Nationally, manufacturing averages 9.5% of GDP, so Alaska is less manufacturing-intensive than the national average.
  • What is the largest manufacturing industry in Alaska? Food, Beverage, and Tobacco Products leads at $903M (2025), followed by petroleum and coal products ($146M) and other transportation equipment ($124M), per BEA state GDP by industry.
  • Is manufacturing in Alaska growing? Alaska's manufacturing GDP is up 2.7% year over year in dollar terms and up 2.6% after inflation, per the latest BEA annual data (2025).
  • Does Alaska make more durable or nondurable goods? Nondurable goods lead in Alaska: $1.1B versus $368M of value added in 2025.

About this data

  • Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.

Last reviewed 2026-09-30.